Flooring challenge met by Remmers

The new 1,600m² workshop facilities at The Trade Centre Wales in Neath, required a breathable anti-slip system to be installed due to the uncertain moisture levels of the relatively new substrate.

The installers TPS360, measured the moisture levels during the installation and to facilitate the curing process, temporary heating and ventilation systems were used to reduce any moisture present.

A FeRFA Type 3 high build floor coating system was then applied in two coats. Remmers BS3000 SG was selected as a high quality, damp tolerant resin, with a wide application spectrum and VOC free properties. ADD 250 Polymer Beads were then added to provide an anti-slip, textured finish to give a surface that remained easy to clean.

The coating system was installed to a timed scheduled which tied in with other key equipment installation phases.

Share this article

Login to post comments

About us

Future Constructor & Architect is a specification platform for architects and building contractors, which focuses on top-end domestic and commercial developments.

As well as timely industry comment and legislation updates, the magazine covers recent projects and reviews the latest sustainable building products on the market. Subscribe here.

Privacy policy

Latest updates

e-newsletter

Sign up below to receive monthly construction, architecture and product updates from FC&A via email: