Powdertech Corby Ltd has recently used its popular Evolution ‘Peat Fire’ powder coating finish on the refurbishment of a Greggs store at the Glasgow Fort shopping and leisure destination.

Ravago Building Solution’s Ravatherm XPS X 300 SB high-performance extruded polystyrene (XPS) thermal insulation boards are being used in the construction of R-WALL, a new innovative, government-supported build system, revolutionising how houses are constructed in the UK.

There are occasions when schools need extra space quickly, cheaply and with minimal disruption. TG Escapes modular offsite process means they can work with main contractors to deliver projects that would not normally be achievable.

The Macallan Distillery and Visitor Experience in Craigellachie, Speyside in Scotland is a stunning sight. Five meadow-covered hills hide the undulating roof of the distillery. The contemporary building combines a wooden roof with glass and steel. Fast, light and green Kerto LVL (laminated veneer lumber) was used as part of the prefabricated roof.

There is an innovative way to make air as fresh as possible within educational buildings, and thus achieve compliance with Government guidelines(*).

A major new residential building in Bristol is defined by its 170m long façade, clad in Nordic Brown Light pre-oxidised copper, complementing its modern, listed neighbour.

How grooved solutions have been making contractors and engineers reimagine the way they construct risers in vertical buildings.

With the world still in the grip of COVID-19, the built environment is having to respond. While lockdown is easing, it is being done on the condition that social distancing and hygiene are top of the agenda for individuals and businesses. This means changes to the places we work, shop and relax; changes that are likely to remain until next year at least.

This has been an unprecedented year on many levels, what with construction sites having to implement social distancing measures and four in 10 architects reportedly struggling with their mental health during lockdown . The industry has been battling to keep sites open and building work progressing, and the UK’s 2020 outlook now sits between a contraction of 5 to 12%, with the bounce back in 2021 forecast to be between 1 and 10%.

Major construction projects are becoming increasingly more complex, involve multiple task teams and span several years, making projects fraught with challenges. As individual task teams work in isolation from other members of the delivery team, the result is unsynchronised processes and procedures with no defined standards for quality control. As a result, issues are only identified as work commences on site, causing abortive work and wasted materials which all come at a cost to the project and the environment, says Paul Hargreaves, Group BIM Manager at TÜV SÜD.

About us

Future Constructor & Architect is a specification platform for architects and building contractors, which focuses on top-end domestic and commercial developments.

As well as timely industry comment and legislation updates, the magazine covers recent projects and reviews the latest sustainable building products on the market. Subscribe here.

Privacy policy

Latest updates

e-newsletter

Sign up below to receive monthly construction, architecture and product updates from FC&A via email: