Six ways to avoid green roof disasters

Mike Goodhead, Divisional Manager for ISD Solutions’ new industrial waterproofing division, explains what you should look out for when considering a green roof and how to maximise success.

Gallery

G

reen roofs have come a long way as genuine construction options. An understanding of how they work, plus training and installation expertise, means that failures are now very rare. Technical advances and quality of the materials used has also contributed. Today, green roofs can be designed to meet a wide variety of commercial requirements and generally fall into three categories – Extensive, Semi-Intensive and Intensive. Each has a progressively deeper growing medium, up to a metre in depth for Intensive types, with differing maintenance and irrigation requirements. These in turn have different weight and structural considerations and require different roofing solutions. The waterproof membrane is critical here, and there are a wide range of products available covering the latest liquid applied systems, hot melt, mastic asphalt and numerous built-up systems. And each has different application requirements.

1. Get expert input

On top goes the root barrier, insulation, drainage layer, particle barriers, the growing medium followed by the planting scheme. With so many variables each influenced by different factors, from the structure of the roof deck and depth of the growing medium, to prevailing weather and stormwater management, expert input to select the right solution is essential.

2. Design out issues

A key step to minimising risk is to engage with the installation contractor, and where necessary the roof system manufacturer, at the earliest stages of a project, before construction commences. On new-builds this may have to wait until the main contractor is appointed, but the earlier the better. In this way, the project benefits from expert input as the design is developed. It also affords full understanding of the roof structure, drainage, penetrations, upstands, parapets and plant, so that an appropriate waterproofing design can be developed and potential issues can be identified and plans modified.

3. Communicate changes

Invariably, design changes occur once on site and good change control procedures must be followed. This ensures that roofing contractors are party to new detailing and openings which may affect the proposed waterproofing scheme. This factor is frequently overlooked and is a cause of concern if not monitored closely.

4. The right contractor

When selecting a contractor, look for an appropriate track record, but also expertise at the design stage. Evidence of proper training (many waterproofing products still require skilled hand application), product knowledge, the depth of relationships with manufacturing partners, contractor checks and guarantees, should all be examined. ISD Solutions puts strong emphasis on all these factors, and we are always pleased to provide examples.

5. Double test

Once the roof slab is cast, the waterproof membrane can be applied, ensuring that internal trades can proceed as early as possible. Electronic testing to check the integrity of the membrane is next. Any earths will signify a potential leak and remedial actions can be taken. Competent contractors will conduct this phase as a matter of course; nevertheless, site managers should check that comprehensive testing is conducted properly. Repeat testing, once follow-on trades are complete and prior to the build-up of subsequent planting layers and finishes, will ensure a fault-free installation.

6. Protect your investment

The waterproof layer is at its most vulnerable when it has just been laid and where follow-on trades are still active. In London, especially where construction space is restricted to the footprint of the building, a new flat roof is all too tempting for storing construction materials and these are literally craned up by the pallet load. Remember, the membrane may only be a few millimetres thick, so it is easy to tear up, puncture or rip, hence the double test procedure described. Effective site management limits accidental damage, but we prefer not to take chances and advocate rubber mats and 20mm ply to provide a temporary protective covering until the final built-up layers can proceed.

With planting finished, it is crucial that access is restricted and irrigation is continued until the roof takes properly or until the point of handover when appropriate guidance on irrigation and maintenance should also be detailed. A 12-month follow-up visit, something that should be included as standard, will help to pinpoint issues and any maintenance shortcomings.

Share this article

Tagged under:
Login to post comments

About us

Future Constructor & Architect is a specification platform for architects and building contractors, which focuses on top-end domestic and commercial developments.

As well as timely industry comment and legislation updates, the magazine covers recent projects and reviews the latest sustainable building products on the market. Subscribe here.

Privacy policy

Latest updates

e-newsletter

Sign up below to receive monthly construction, architecture and product updates from FC&A via email: